Stormwater Management · Integrated Water Management · Feasibility · Strategy · Design

Advisory and Capacity Building

Advisory work is independent technical advice for councils and program teams: what the standards and codes require, what will work on site, and where the rules themselves need to change. Capacity building is the same knowledge passed on through training, so the teams who review, build and maintain water assets can make those calls with confidence themselves.

A large red corrugated rainwater tank installed beside the Puffing Billy Railway building, with new downpipes, fittings and a control box on the wall.

Tanks for Platypus

Engineering advice to Yarra Ranges Council’s Tanks for Platypus program, where smart rainwater tanks help restore flows in Monbulk Creek for its threatened platypus.

Read the project