Stormwater Management · Integrated Water Management · Feasibility · Strategy · Design

Projects

A large red corrugated rainwater tank installed beside the Puffing Billy Railway building, with new downpipes, fittings and a control box on the wall.

Tanks for Platypus

Engineering advice to Yarra Ranges Council’s Tanks for Platypus program, where smart rainwater tanks help restore flows in Monbulk Creek for its threatened platypus.

Read the project
Kororoit Creek winding through a shallow valley of native grasses, reeds and scattered trees under an overcast sky, near where the Deanside wetland outlet will connect.

Deanside Wetland

Functional design of a sediment basin, wetland and retarding basin at Deanside in Melbourne’s west, for Mormac with SMEC, under Melbourne Water’s Deanside Drive Drainage Scheme.

Read the project

Independent technical advice and training for councils and program teams.

A large red corrugated rainwater tank installed beside the Puffing Billy Railway building, with new downpipes, fittings and a control box on the wall.

Tanks for Platypus

Engineering advice to Yarra Ranges Council’s Tanks for Platypus program, where smart rainwater tanks help restore flows in Monbulk Creek for its threatened platypus.

Read the project